Roggeveld Wind Farm Project

Roggeveld Wind Farm is a 147 MW project located near Laingsburg, Western Cape. It generates enough clean energy to power nearly 50 000 homes annually. 

Introduction

fact sheet

Roggeveld Wind Farm is a 147 MW project located near Laingsburg, Western Cape. It generates enough clean energy to power nearly 50 000 homes annually. Developed under the REIPPPP Programme, the wind farm reduces reliance on fossil fuels by offsetting over 500 000 tonnes of CO₂ emissions per year. Eskom is the primary purchaser of this clean energy. 

Socio-Economic Development Programmes 

The Building Energy Opportunity Trust was created to ensure the empowerment of black people. The Trust owns 2.5% of the project and undertakes public benefit activities, which will include 

  • the development of poor communities
  • the promotion of community-based projects
  • the provision of training, the promotion of micro enterprises
  • the building and equipping of crèches for the poor
  • scholarships and other community-based programmes:
    • 0.6% of the revenue is spent on enterprise development contributions. This equates to R96.3 million (nominal) or R30.8 million (NPV at COD) over the life of the project.
    • 1.5% of the revenue is spent on socio-economic development contributions. This equates to R240.8 million (nominal) or R77.1 million (NPV at COD) over the life of the project. 
Project Financing
Public
E&S Risk category
Category 3
DBSA Involvement
  • Approved: November 2017
  • Financial Close: 13 April 2018
  • Commercial Operation: 26 February 2022
  • Total Project Cost: R4.86 billion
  • DBSA investment: R962.2 million

Location: Roggeveld, 45 km northwest of Laingsburg, Western Cape

SDGs and NDP Outcomes impacted: SDG 7 Affordable and Clean Energy

Sustainability Impact

Outputs 

  • Technology: Wind turbines
  • Installed capacity: 147 MW
  • Operational life cycle of the plant: Design life of the turbines: 20 years
  • Turbines built: 40 x 3.15 MW wind turbines and 7 x 3.0 MW wind turbines and its associated infrastructure.
  • Capacity / MW Allocation: 147 MW

Outcomes Environmental Impact

  • CO reduced emissions / CO emissions: 528 915 tCO
  • Households supplied with clean energy: ±100 000

Economic Impact: 

  • Local Content Value: R 723 million
  • Local Content: 40%

Job Creation: 

  • 386 positions created during construction (citizens)
  • 33 full-time, long-term operational jobs (citizens)

Training and Development: 

  • Individuals impacted: Local community
  • Women empowered: 3.69% of the total amount of procurement spend

Community Benefits 

  • Community Trust ownership: 2.5%
Stats
Location

Roggeveld, 45 km northwest of Laingsburg, Western Cape 

Installed capacity

147 MW 

Operational life cycle of the plant

Design life of the turbines: 20 years

CO2 reduced emissions

528 915 tCO2

Households supplied with clean energy

±100 000

Amount financed by DBSA

R962.2 Million